Template:Psi-tech-maturity
From FusionGirl Wiki
Jump to navigationJump to search
Standard Mk0→Mk3 maturity table for Psi-Tech device pages.
Usage
{{Psi-tech-maturity
| mk0_status=Complete
| mk0_conf=100% (symbolic/cosplay)
| mk0_evidence=Build + ritual practice
| mk0_next=User satisfaction surveys
| mk1_status=Active
| mk1_conf=20% (mechanism unverified)
| mk1_evidence=Bench RF emission + sensor logs; no blinded trials
| mk1_next=Blinded RCT vs. sham (N=20, 4-week crossover)
| mk2_status=Planned
| mk2_conf=30% (contingent on Mk1 RCT)
| mk2_evidence=Field deployment + telemetry
| mk2_next=Multi-site pre-registered trial
| mk3_status=Projected
| mk3_conf=40% (contingent on Mk2 replication)
| mk3_evidence=Standardised BOM + EA auxiliary rollout
| mk3_next=Long-term cohort study
}}
See Tho'ra Tech Maturity Levels for the convention.